TEAM OF THE YEAR AWARD FINALIST, LARGE-SCALE PROJECTS: BAXTER HEALTHCARE CORP.'S NORTH COVE 1-L IV SOLUTIONS TEAMOver the last several years, Baxter Healthcare Corporation's Marion, N.C. "North Cove" plant began a focused effort toward Lean Manufacturing. In the beginning, not all North Cove workers were sold on the new approach. This included the members of the 1-liter IV Solutions team. "We thought it might be just another buzzword," says Terry Foxx, the team's manufacturing manager.Comprising a large portion of the plant's total volume, the 1-liter IV solutions line was one of two product codes selected for value stream mapping and Lean-driven changes, and thus became critical to the plant's overall Lean efforts. The core 1-L IV value stream team includes 11 cross-functional members from plastics, filling, packaging and sterilization manufacturing departments, as well as the release department, quality labs, the replenishment center and various support functions.Sixteen months after the launch of the team-driven reform, the entire work area is singing the praises of Lean, and, as Foxx puts it, "singing from the same hymnbook." In other words, North Cove's Lean initiative drawing upon tools and concepts like 6-S, cellular flow, pull systems and value stream mapping has not only eliminated waste and increased productivity, but it has also brought everyone involved in the process, from leaders to line operators, together working toward the same goal: optimizing the product value stream. Among the achievements so far:
- Cycle time for production and release has improved 74%.
- Productivity improvements have increased the number of daily direct ship loads by 175%.
- Solution container scrap on the fill line has been reduced by 50% per month.
- In-process inventory has been greatly reduced 33% between filling and sterilization and 62% between sterilization and packaging. Approximately 35% fewer product carriers are now needed.